Cozy Experimental Aircraft Project

Cozy Experimental Aircraft Update – March 31, 2018

Permanent Installation of the aircraft floor. Shop temperature was 25 deg C and humidity 39%. Several batches of medium stiff flox was mixed.    The flox was applied on all the mating surfaces: longerons, seatback, heat duct, and front bulkhead F22. Shims were positioned and floxed. Noah helped me lift the floor off the work …

Cozy Experimental Aircraft Update – March 31, 2018 Read More »