Cozy Experimental Aircraft Update – April 15, 2018

Removed the temporary board supporting the aft end of the floor then scraped the glue from the landing gear bulkhead.

Shop temperature 25 deg C and humidity 41%.

Cut 2 pieces of BID cloth 33″ x 2″.

Mixed a cup of epoxy using 112g resin and 42g hardner.

Wet out the 2-ply BID tape then applied epoxy to the corner of the landing gear and floor.

Mixed a batch of flox and applied it to the corner.

Cut out the BID tape and applied it to the corner and used a brush to stipple the tape.