Cozy Experimental Aircraft Update – October 1, 2017

Layed out and marked on the glass side of one of the two triangular braces where the map compartment spacers will be installed. The ends that meet were beveled for best fit. The two triangular braces were stacked and clamped together foam to foam and small holes were drilled through both braces where nails will …

Cozy Experimental Aircraft Update – October 1, 2017 Read More »

Citabria Update – September 30, 2017

The annual inspection was completed last week and this morning we were able to take the plane up for a post maintenance flight. Why is there always a crosswind ??? Today’s flight video.     Dave doing the post flight paper work while Jason puts his feet up since no snags were found.

Cozy Experimental Aircraft Update – September 17, 2017

Cut four 10″ x 2″ strips of BID cloth at 45 deg orientation. Shop temperature was 25 deg C and humidity 48%. 46g resin was mixed with 18g hardner. Wet out two sets of the strips (2-ply each) with the epoxy. Wet the inside corners of the lower firewall with epoxy. Poured some of the …

Cozy Experimental Aircraft Update – September 17, 2017 Read More »