Cozy Experimental Aircraft Update – October 6, 2017

Drilled holes through the fiberglass in the triangular braces for the aluminum tube.

Used 5 minute epoxy to put the top pieces of the heat duct together.

Clamped the 3 heat duct pieces to a 2 x 4 for trial fit before floxing. This took awhile to get the pieces oriented and aligned correctly.

Shop temperature set to 25 deg C and humidity 52%.

40g resign and 15.2g hardner mixed with flox and applied to the heat duct to secure the sides to the top.

Curing in progress.