Canopy Hinges

The locations for the canopy hinges were marked on the longeron. Two pieces of MS20001-P6 hinges were cut to10″ lengths. The hinge halves were separated. Sanded the bonding surfaces of the hinges and the longeron. 220 grit on the hinges and 36 grit on the longeron. Tape was applied to the hinges to keep the …

Canopy Hinges Read More »

October Sky

Today we field tested the wireless launch system at Crooked Creek with a couple medium powered rockets. A video of the flights is on our YouTube channel.

Kawartha Lakes Municipal Airport

This video shows the takeoffs and landings of today’s round trip flight from Peterborough (CYPQ) to Lindsay (CNF4). Grass runway 21 in Lindsay was very bumpy so takeoff was from paved runway 31. Citabria 7ECA