Cozy Experimental Aircraft Update – March 30, 2018
Shimmed gaps between fuselage floor and sides and prepared for permanent installation of the floor.
Shimmed gaps between fuselage floor and sides and prepared for permanent installation of the floor.
Positioning & Fitting floor into fuselage assembly Positioned floor in place. Sanded and used the Dremel tool to level the floor at the front where it mates with bulkhead F-22. Hot glued a temporary block to the forward landing gear bulkhead 1/4” below the scoop cut out to support the fuselage floor while it cures …
Cozy Experimental Aircraft Update – March 25, 2018 Read More »
Removed the peel ply. Trimmed the edges with the Dremel tool. I went through four heavy duty cutter wheels while trimming the edges. Wearing the face shield was a good choice ! Sanded the edges. Sanded the floor then vacuumed up the fiberglass dust.
Glassing the Cozy MK IV floor Workshop temperature was 25 deg C and humidity 38%. The entire surface was covered with micro slurry then a batch of dry micro was mixed and used to fill in any holes and to make a generous radius in all corners. Two plies of BID cloth at 45 deg …
Cozy Experimental Aircraft Update – March 12, 2018 Read More »
Added a radius to the top edges of the floor spacers so the glass cloth will conform. Also added a radius to the front edge that interfaces with bulkhead F22 to allow the glass cloth to lay down vertical over the front edge. Lastly, I vacuumed the foam dust from the aircraft floor.