Cozy Update – January 8, 2016
I sanded the electrical channel cover flush with the foam, vacuumed, and turned up the thermostat to start heating the shop for tomorrows work.
I sanded the electrical channel cover flush with the foam, vacuumed, and turned up the thermostat to start heating the shop for tomorrows work.
BID cloth cut at 45 deg orientation and rough fit to form the electrical channel cover. Shop temp 24 deg C and humidity 38 %. 30g resin and 11g hardner mixed with glass bubbles to make micro slurry. Micro applied go the areas of foam where the BID cloth will be located. BID cloth positioned …
A successful road trip to Guelph today to pickup a centresection jig which will be used to fabricate the main spar for the COZY MK IV … The jig made it back to our workshop and is safely stored under the work table.
Sanded LWX & LWY corners and vacuumed. Shaped foam (using a utility knife, coping saw, and 5-minute epoxy) to fit in the area between LWX, LWY, and the lower longerons on both fuselage sides.