Cozy Experimental Aircraft Update – September 4, 2017
Prepared inboard foam shims for the lower firewall installation. Inboard foam shims 5-min epoxy’d in place. Electrical channels carved out on each side.
Prepared inboard foam shims for the lower firewall installation. Inboard foam shims 5-min epoxy’d in place. Electrical channels carved out on each side.
Used 5 minute epoxy to install the outboard foam shims prior to lower firewall installation.
Flying some circuits this morning before the winds picked up for the day. Lots of jets at CYPQ this morning.
The top of the lower firewall needs to be flush with the top of the stringer so I filed the lower firewall holes for a better fit with the stringers and longerons. The firewall is positioned in exactly the right place but there are some foam gaps between the fuselage sides and the firewall so …
Cozy Experimental Aircraft Update – August 24, 2017 Read More »
Departed Peterbrough (CYPQ) and headed to the Rice Lake practice area and climbed to 4500′. Practiced steep turns, aileron rolls, and spiral dives. Click here for a short video of the flight.