Cozy Experimental Aircraft Update – December 29, 2017

Removed the 2x4s and clamps from the heat duct and seat brace assembly.

Prepared 2” wide tape joints to reinforce the seat brace & heat duct at the bulkheads. Dacron and 2 plies of BID cloth at 45 deg C were placed on a wax paper template.