Repaired some areas of the NACA scoop between the landing gear bulkheads where there were air bubbles after the 2-ply BID layup. Injected epoxy for the smaller air bubbles and sanded and patched one other spot.
Continued rounding the bottom corners of the fuselage to shape.

Marked a 1″ wide area forward of the landing brake and a 2″ wide area alongside and aft of the landing brake.

Fabricated a 1″ x 2″ sanding block for making a 1/16 ” depression around the landing brake.