Measured and marked 6.25″ (from F22) on both top longerons to identify where bulkhead F28 will be placed.
Trimmed and sanded the instrument panel and bulkhead F22 joints.
Marked where the 12″ x 4″ taped joint will go on F22 and the fuselage sides. This will support the canard wing.