Ensured the longerons are level side to side and front to back.
Placed plastic on the floor in preparation for glassing the bottom of the fuselage.
Cut 4″ wide strips of UND cloth to install reinforcing layups for the landing gear hardpoints and the engine mount hardpoints as per figure 19.