Saturday evening in the workshop …
Shim added to top front of right fuselage side.
Lots of sanding of the left fuselage side to align it with the front bulkhead F22.
Small shim epoxy’d to top front of left fuselage side.
5-minute epoxy used to add the shims.
Front bulkhead F22 and the fuselage sides are temporarily clamped into position.