Front bulkhead F22 raised by 1/16″ to be aligned with WL (water line) 23 at the top and confirmed alignment with centre of jig.
The right side of the fuselage side was sanded down so the side would be level at WL 23 at the front. i.e. the top longeron would be level with the top of F22.