Positioning & Fitting floor into fuselage assembly
Positioned floor in place.
Sanded and used the Dremel tool to level the floor at the front where it mates with bulkhead F-22.
Hot glued a temporary block to the forward landing gear bulkhead 1/4” below the scoop cut out to support the fuselage floor while it cures in place. This positions the floor 1/8″ above the cut out.
Weighed down the floor and clamped the sides to uncover areas needing shims.
Started shimming any gaps on the sides.