Installing the centre floor spacer over the landing brake cutout.
The workshop temperature was 25 deg C and the humidity was 36%.
110g resin, 42g hardner, and micro bubbles were mixed together and applied with a squeegee to the floor area where the centre spacer is installed.
The centre spacer was positioned in place and weighed down with a few books and held in place with a couple nails and clamps while it cures.