Two plies of BID cloth were cut to 33″ x 1.5″ to tape the joint between the bottom and top half of the landing gear bulkhead.
Peel ply was removed from yesterday’s 3-ply UND layups.
Shop temperature was 25 deg C and humidity was 51%. Epoxy was mixed together with 98g resin and 38g hardner.
The 2-ply BID tape was wet out and epoxy was lightly brushed on the bulkhead where the tape is placed.
A small batch of flox was mixed and applied to the joint between the upper and lower bulkhead to ensure a smooth transition for the cloth.
The 2-ply BID tape was cut out with electrical scissors and applied to the bulkhead joint and then covered with peel ply.