Sanded the top half of the forward landing gear bulkhead to fit flush with stringer LWX.
Shop temperature at 25 deg C and humidity 48%.
56g resin and 22 g hardner were mixed together.
Taped forward landing gear bulkhead with 2 plies of BID and peel ply.
Flox was added to the epoxy and applied to the mating surfaces of the top half of the landing gear, the fuselage sides, and the forward landing gear bulkhead.
Clamps were used to hold the upper half of the landing gear bulkhead in place while it cures.