Workshop temperature was 25 deg C and 47% humidity.
15g Resin was mixed with 6g hardner and flox.
Flox was applied to all mating surfaces between the fuselage sides and the front landing gear bulkhead.
The bulkhead was positioned in place, and centerline verified.
It was blocked into position and left to cure.