Preparations to install the forward landing gear bulkhead completed.
Four 8″ x 8″ squares were cut out of plywood.
The squares were hot glued to the forward landing gear bulkhead to ensure that it will be located 8″ forward of the aft landing gear bulkhead and to assist in aligning the 0.25″ drilled holes between both landing gear bulkheads.