Cozy Update – January 3, 2016

BID cloth cut at 45 deg orientation and rough fit to form the electrical channel cover.

IMG_2480

Shop temp 24 deg C and humidity 38 %.

30g resin and 11g hardner mixed with glass bubbles to make micro slurry.

Micro applied go the areas of foam where the BID cloth will be located.

IMG_2482 IMG_2481

BID cloth positioned to form channel cover and fine trimmed with the electric scissors.

30g resin and 11g hardner mixed to make epoxy.

Epoxy applied to the cloth and left to cure.  Weight (wood) added to foam to keep flush with work table so outboard side of the electrical channel cover stays flush with the work table and the foam.

IMG_2484 IMG_2483