Archive for April, 2020

Citabria – April 25, 2020

Apr 25 2020

Solo flight out of CYPQ then over to our Crooked Creek rocket launch fields for some airwork at 4000′ ASL and below.…

Blue Dart Beta – April 18, 2020

Apr 18 2020

This was the first flight of Blue Dart Beta. Length: 23.5”(59.69cm)Diameter: 1.637”(41.6mm)Weight: 2.4oz (72g); It flew on a D12-7 engine today. Next…

Blue Dart Alpha – April 11, 2020

Apr 11 2020

It was a little windy at Crooked Creek today but still a good day to fly our Blue Dart Alpha. The first…

Blue Dart Beta – Design & Build

Apr 08 2020

The Blue Dart Beta is the second in a series of Blue Dart rockets we have designed. It will fly using sizes…

Hybrid Rocket Motor Delta Test

Apr 04 2020

This ground test was designed to test our remotely controlled igniter and oxidizer valve with a hybrid rocket motor. Our hybrid rocket…

Launch Controllers & Igniters

Apr 02 2020

We appreciate all the new orders for our launch controllers and electric spark gap igniters. The assembly of the next batch is…