Month: July 2016

Cozy Update – July 11, 2016

There was a small void in the lower front of each fuselage side. I drilled a small entry hole in both voids and using a syringe, I filled both voids with epoxy until the epoxy dripped out the front.
Workshop temperature was 27 deg C and humidity was 49%.  I mixed 15g resin with 5.7g hardner.
IMG_0071 IMG_0073 IMG_0074 IMG_0075 IMG_0076

Cozy Update – July 10, 2016

A centreline was marked on the plank at 4.625″ (4 5/8) from each side.

IMG_0053 IMG_0054

Two sets of two 2x4s were nailed to the 10′ plank perpendicular to the centerline, level, and exactly 101.75″ apart. The 101.75″ is measured from the outboard side of both sets and 101.75″ was confirmed across multiple locations along the 2x4s.

IMG_0063 IMG_0064 IMG_0065

The temporary firewall will be added to complete the jig, then fuselage assembly can start.

IMG_0066 IMG_0067

Cozy Update – July 3, 2016

Procured a 2″ x 10″ x 10′ plank and two 2″ x 4″ x 8′ s for Cozy fuselage assembly and alignment.

IMG_0040

A 2″ x 10″ x 10′ plank was placed in position on the shop floor and shimmed level. This plank will serve as the base ( W.L. 0.0) of the jig for fuselage assembly.

Cut the two 2″ x 4″ x8′ boards into four 2″ x 4″ x 4′ pieces.

IMG_0048 IMG_0049